Our new home
In the south of the Neumarkt urban area, on the site on the B299, a modern logistics hall with a striking wave-shaped roof and an adjoining office building has been under construction since March 2024. The three-storey administration building of the logistics centre houses its own exhibition area and a canteen, while the logistics hall has over 18,000 square metres of storage space with more than 8,200 pallet spaces.
On 21 July 2025, we were able to move into our new company headquarters.
Construction site documentation
Tour
Project facts
- Groundbreaking ceremony: 4 March 2024
- Move-in date: 21 July 2025
- Logistics hall/administration building:
- Wood hybrid structure
- Facade construction with protruding ‘wood X’
- 2,000 m³ of glued laminated timber and 600 m³ of cross-laminated timber were used
- Logistics hall:
- Storage area: 18,000 sqm
- Dimensions: 162 x 109 m, height: 13.5 m
- Span between supports: 23 m
- Pallet storage spaces: 8,256, including 2,220 picking spaces
- Large-scale PV system for own use and feed-in
- Green roof covering over 75% of the area
- Administration building:
- Office space: 1,800 square metres on three levels
- Dimensions: 20.5 x 37 metres, height: 13 metres
- Fully accessible
- Heating/cooling screed for room climate control
- Gravel-covered roof areas:
- Use of rainwater for grey water utilisation
- Heat/power generation and sustainability:
- Photovoltaic system with 2 MWp output
- 500 kW heat pump with 17 ice storage tanks
- KfW-40 standard
- DGNB silver certification targeted